Crane equipment for the Morowali power plant project in Indonesia

Two 120-Ton Overhead Cranes for a Power Plant in Indonesia

Location
Morowali Industrial Park, Central Sulawesi, Indonesia
Application
Heavy lifting for power plant construction
Equipment
Two double-girder overhead cranes
Rated lifting capacity
120 tons per crane
Power project
Three 380 MW supercritical coal-fired generating units
Project stage
Crane supply for construction
Share

Henan Mine supplied two 120-ton double-girder overhead cranes for a thermal power plant project in Morowali Industrial Park, Central Sulawesi, Indonesia. The cranes were supplied to support construction of three 380 MW supercritical coal-fired generating units.

Heavy component handling shown in the Indonesia project photographs

Project at a glance

ItemProject detail
LocationMorowali Industrial Park, Central Sulawesi, Indonesia
ApplicationHeavy lifting for power plant construction
EquipmentTwo double-girder overhead cranes
Rated lifting capacity120 tons per crane
Power projectThree 380 MW supercritical coal-fired generating units
Project stageCrane supply for construction

A heavy-lifting requirement in power infrastructure

The thermal power project is intended to support electricity demand in the Morowali industrial area. Construction of the generating units involves the movement and positioning of heavy components, making lifting equipment part of the project’s construction requirements.

The scope described here consists of two overhead cranes supplied by Henan Mine. The three generating units define the wider power project; they are separate from the quantity of cranes supplied.

Two 120-ton double-girder overhead cranes

Each supplied crane has a rated lifting capacity of 120 tons and uses a double-girder overhead configuration. The equipment was manufactured for the heavy lifting required during construction of the power plant.

The double-girder arrangement and specified capacity form the core of this case. For a new project, the required span, lifting height, available headroom, runway arrangement, and operating duty would also need to be established before a comparable crane configuration could be selected.

Controlled movement during component handlin

The project equipment is described with smooth crane travel and controlled load positioning as key operating features. These characteristics support the movement of heavy components within the working area and their placement during lifting and installation work.

For power plant procurement teams, lifting capacity is only one part of the specification. The path followed by a load, the available installation space, and the required positioning task should also be described when discussing equipment requirements. The Morowali supply is a reference for a heavy-lifting application at the construction stage.

Supply milestone and project scope

Henan Mine’s recorded milestone is the supply of the two cranes for the Indonesian power plant project. Their intended application is construction support for the generating units.

This case focuses on that equipment supply and application. The cranes are presented as a project reference for double-girder overhead lifting equipment used in power infrastructure construction.

Information for a similar power plant enquiry

Prepare a lifting schedule identifying the largest components to be handled, their weights and dimensions, and the locations where they must be placed. Include building and runway drawings where available, together with the required lifting height and site power supply.

If a crane is intended to serve both construction and later maintenance, describe both sets of tasks. This helps define the required equipment scope before procurement and provides a clearer basis for discussing the crane layout and operating configuration.

Project questions

How many cranes were supplied for this project?

Two double-girder overhead cranes were supplied, each with a rated lifting capacity of 120 tons.

What do the three 380 MW units refer to?

They are the supercritical coal-fired generating units in the power plant project that the cranes were supplied to support during construction.

Discuss overhead cranes for your power project

Share the component lifting schedule and available building drawings to begin a discussion about the required capacity, layout, and construction lifting tasks.

Discuss your project

Related equipment:

Overhead crane configurations

Related Cases

Paraguay's first launcher girder bridge crane
Paraguay’s first laucnher girder bridge crane has begun working

This is the first launcher gider crane exported to Paraguay by hycrane company, 100 tons

Paraguay's first launcher girder bridge crane
Indonesia Winch trolleys for 150t launcher girder crane

Our equipment solves the limitation problem of customer site,and provide support for building Bridges

launcher girder bridge crane in Paraguay
Uzbekistan 16T overhead crane

Project in Uzbekistan: LD 10T & LD 16T overhead crane have been complete the installation work

double girder crane in Vietnam
Vietnam Yishan Steel Group Project

In recent years, Henan Mi…

Get A Free Quote
We Provide One-Stop Crane Solution Services.
whatsappWhatsapp Message Email