Welcome to Henan Mine Crane Co.,Ltd.

Red ladle crane equipment for the Turkish metallurgical project

450-Ton Ladle Crane for a Metallurgical Project in Türkiye

Item Project detail
Location Türkiye / Turkey
Application Molten metal handling
Crane type Ladle crane
Rated lifting capacity 450 tons
Structural configuration Four girders and four rails
Control architecture PLC with an open industrial Ethernet bus
Project scope Customized metallurgical crane
Share

Henan Mine developed a customized 450-ton ladle crane for a metallurgical customer in Türkiye. The project combines a four-girder, four-rail structure with trolley-frame machining, PLC-based control, and equipment monitoring for molten metal handling.

Factory view of the ladle crane structure

Project at a glance

ItemProject detail
LocationTürkiye / Turkey
ApplicationMolten metal handling
Crane typeLadle crane
Rated lifting capacity450 tons
Structural configurationFour girders and four rails
Control architecturePLC with an open industrial Ethernet bus
Project scopeCustomized metallurgical crane

Engineering for a large-capacity metallurgical application

The customer’s requirement was a large-capacity crane for the demanding conditions of metallurgical production. The design addresses molten metal handling, where the crane structure, mechanical arrangement, controls, and operating information need to be considered together.

The project is presented around the equipment’s documented design and manufacturing features. Its 450-ton capacity identifies the featured ladle crane; the structural and control details explain the configuration behind that capacity.

Four-girder, four-rail construction

The crane adopts a four-girder, four-rail arrangement with an integrated large-reducer configuration. These are central elements of the project’s mechanical design for heavy-load handling.

Finite element analysis was used during engineering to evaluate structural strength and refine component design. The structural and mechanical systems were developed together around the requirements of the metallurgical application.

Trolley-frame treatment and integrated machining

The trolley frame undergoes stress-relief annealing followed by integrated machining. This manufacturing sequence is intended to support dimensional accuracy and assembly consistency.

For a crane of this scale, the fit of the trolley-frame components is an important part of the assembly process. The stress-relief treatment and machining sequence are therefore presented alongside the structural arrangement as key features of the project’s manufacture.

PLC control and provision for future interfaces

The crane uses a PLC-based control system with an open industrial Ethernet bus. Interfaces are reserved for potential intelligent upgrades and system integration as the customer’s requirements develop.

Reserved interfaces are part of the control architecture. They provide a basis for discussing future functions; any additional automation would require its own defined scope and integration requirements.

Operating information and monitoring

The equipment includes a safety monitoring and management system that provides alarms and records operating information. These functions support visibility of equipment status and the information available for maintenance management.

In combination with the structural design, machining process, and control architecture, monitoring forms part of the project’s overall engineering approach to a heavy-duty metallurgical lifting task.

Preparing a ladle crane specification

For a new enquiry, describe the molten metal handling process, required load, lifting attachment, workshop layout, and operating conditions. The scope should also identify the information operators need from the crane and any interfaces required by plant systems.

A project-specific technical review is needed to define the configuration and acceptance requirements. The Turkish project provides a reference for discussing large-capacity ladle crane engineering and the associated control and monitoring scope.

Project questions

What structural arrangement is used?

The featured 450-ton ladle crane uses a four-girder, four-rail arrangement with an integrated large-reducer configuration.

Does the control design include upgrade interfaces?

Yes. The PLC-based architecture includes an open industrial Ethernet bus and interfaces reserved for potential intelligent upgrades.

Discuss your ladle handling requirements

Provide the process requirements, load details, workshop drawings, and required control interfaces to begin a project-specific equipment discussion.

Discuss your project

Related equipment:

Overhead crane solutions

Related Cases

Paraguay's first launcher girder bridge crane
Paraguay’s first laucnher girder bridge crane has begun working

This is the first launcher gider crane exported to Paraguay by hycrane company, 100 tons

Paraguay's first launcher girder bridge crane
Indonesia Winch trolleys for 150t launcher girder crane

Our equipment solves the limitation problem of customer site,and provide support for building Bridges

launcher girder bridge crane in Paraguay
Uzbekistan 16T overhead crane

Project in Uzbekistan: LD 10T & LD 16T overhead crane have been complete the installation work

double girder crane in Vietnam
Vietnam Yishan Steel Group Project

In recent years, Henan Mi…

Get A Free Quote
We Provide One-Stop Crane Solution Services.
whatsappWhatsapp Message Email